Brisbane · South East Queensland
Real-time network recovery for Brisbane.
Live on buses and suburban trains across South East Queensland, on the network's public real-time data.
For the control room
The recovery move, the deadline, and who gains.
When trains bunch or buses fall behind, Headway shows the move that helps passengers most, what it costs, and the time left to make it. Leaving it is always on the card.
Hold the 4:28 pm T4 to Cleveland 2 min at Bowen Hills
Cleveland line · bunched 1 min behind the train in front, with a 4 min gap behind it
Includes the riders on the trains behind it and the people waiting for them further down the line.
A Brisbane train recommendation, 20 November 2026, redrawn.
Service recovery in Brisbane
For the problems a network has every day.
- Bus bunchingHold the bus behind, or run the front one express, to even the gaps.
- Trains bunchingHold a train to even the headway, with the trains behind counted.
- Running lateShort-turn so the next trip leaves on time.
- A blocked roadDivert the buses around it.
The console
Sorted by time left to act.

It recommends. People decide.
Headway does not dispatch, talk to drivers, set signals or plan timetables. Every card gives its reasons, and the decisions controllers log are kept, with who made them and when.
Beyond Brisbane
Headway is also live in Sydney, and more Australian and international networks are being added.
